A Daily Network publication
Explore the network
Private Infrastructure Daily
Independent Intelligence on Infrastructure Capital
Tuesday, October 20, 2026The Morning Brief →Sign in
Digital Infra

Evolution Power proposes 1GW data center with 1.3GW solar farm in Norfolk

The 4,695-acre project outside King's Lynn would be decided by national government rather than local councillors.

At a glance

20-second brief
  • Evolution Power Limited has proposed a data center of up to 1GW alongside a solar farm that could generate up to 1.3GW in Norfolk, UK.

  • The solar farm could generate up to 1.3GW, which Data Center Dynamics said would make it the largest facility of its kind in the UK.

  • The project's size means national government would rule on it rather than local councillors.

Evolution Power Limited has proposed a data center of up to 1GW alongside a solar farm that could generate up to 1.3GW in Norfolk, UK. Data Center Dynamics first reported the proposal. The Longmarsh Green Energy project would span 4,695 acres across two sites outside King's Lynn.

The solar farm could generate up to 1.3GW, which Data Center Dynamics said would make it the largest facility of its kind in the UK. The data center would use closed-loop cooling to keep water use to a minimum, and the developer plans battery storage on site connected to an existing substation at Walpole.

Evolution Power says the project could be running by 2032 and would create 500 permanent jobs alongside "thousands" of construction roles. Community consultation runs until November 26, ahead of the submission of a formal planning application.

The project's size means national government would rule on it rather than local councillors. James Wild, the MP for North West Norfolk, told the Local Democracy Reporting Service the development "could represent further large-scale industrialization of the landscape."

Data Center Dynamics reported that Evolution Power does not appear to have experience building data centers.

Until an application is filed, the 2032 opening date sits behind a consent process that has not begun.

Continue your research

Save this analysis and keep the funds you follow together in My Desk.

Sign in to save articles or follow funds.
Sources & further reading
Data Center Dynamics · Local Democracy Reporting Service
More from Private Infrastructure Daily
Digital Infra

Digital Realty breaks ground on 22MW Ankara data center with Rönesans

The first project under the joint venture is due online in 2028; the partnership could eventually reach 200MW, Data Center Dynamics reports.
Digital Infra

Defence Construction Canada posts notice for CA$1.5bn–CA$1.85bn Ontario data center

The 60MW federal facility is planned for the National Capital Region, with the notice for a "modify design built" contract expected in winter 2027.
The Wrap

Microsoft-NiSource power deal makes data center customer fund its own generation

The 20-year contract, closed Oct. 19, adds roughly 1.1GW to NiSource's portfolio from 2028 and covers a northern Indiana data center.
Elsewhere in the networkAll titles →
Every weekday · 6:30 a.m. ET

The Morning Brief

The latest from Private Infrastructure Daily, in your inbox every weekday. Free.